Abdel-Salam, A N (2018) Corporate social responsibility of construction and real estate development companies in developing countries: An assessment model, Unpublished PhD Thesis, , Purdue University.

Abduh, M (2000) Utility assessment of electronic networking technologies for design -build projects, Unpublished PhD Thesis, , Purdue University.

Ahmed, A (2012) Pavement damage cost estimation using highway agency maintenance, rehabilitation, and reconstruction strategies, Unpublished PhD Thesis, , Purdue University.

Al-Sinan, F M (1986) Evaluation of construction management contracts in developing countries, Unpublished PhD Thesis, , Purdue University.

Alqady, M (2012) Leveraging text content for management of construction project documents, Unpublished PhD Thesis, , Purdue University.

Anastasopoulos, P (2009) Infrastructure asset management: A case study on pavement rehabilitation, Unpublished PhD Thesis, , Purdue University.

Arman, M H R (2014) Using option theory to manage risks in highway winter operations, Unpublished PhD Thesis, , Purdue University.

Attallah, S O (2014) A life cycle analysis approach for the enhancement of sustainability decision-making in the construction industry using agent-based modeling, Unpublished PhD Thesis, , Purdue University.

Bayraktar, M E (2006) A decision model to determine the optimal time-cost trade off in highway work zone projects, Unpublished PhD Thesis, , Purdue University.

Beliveau, Y J (1984) A cost control model for on-site work activities for construction (estimating, cost-codes, forms), Unpublished PhD Thesis, , Purdue University.

Bhargava, A (2009) A probabilistic evaluation of highway project costs, Unpublished PhD Thesis, , Purdue University.

Brissi, S G (2021) Principles for the adoption of offsite construction in design and construction companies, Unpublished PhD Thesis, , Purdue University.

Cai, J (2020) Data-driven approach to holistic situational awareness in construction site safety management, Unpublished PhD Thesis, , Purdue University.

Castro-Lacouture, D (2003) B2b e-work intranet solution design for rebar supply interactions, Unpublished PhD Thesis, , Purdue University.

Chao, L-C (1994) An adaptive approach to evaluation of implementation prospects of new construction technologies, Unpublished PhD Thesis, , Purdue University.

Chen, F-C (2021) Deep learning studies for vision-based condition assessment and attribute estimation of civil infrastructure systems, Unpublished PhD Thesis, , Purdue University.

Chen, Y (2013) Measurement models of building information modeling maturity, Unpublished PhD Thesis, , Purdue University.

Chen, Y-T (2008) Automated on-site productivity evaluation using RFID and GPS, Unpublished PhD Thesis, , Purdue University.

Cheng, T-m (1996) Impact of front-end loading on construction project cash-flows: A mathematical approach for determination of unit prices in bidding, Unpublished PhD Thesis, , Purdue University.

Cory, C A (2019) Building information modeling (BIM) - to prepare current construction management students for tomorrow’s construction careers, Unpublished PhD Thesis, , Purdue University.

Cui, Q (2005) A dynamic model for profitability analysis of construction firms: Towards complexity, learning, and uncertainty, Unpublished PhD Thesis, , Purdue University.

de Cresce El Debs, L (2016) A mixed methods study on choice of media influence on construction industry communication, Unpublished PhD Thesis, , Purdue University.

Debella, F M (2020) Profitability improvement of construction firms through continuous improvement using rapid improvement principles and best practices, Unpublished PhD Thesis, , Purdue University.

Georgy, M E (2000) Utility-based neurofuzzy approach for engineering performance assessment in industrial construction projects, Unpublished PhD Thesis, , Purdue University.

Ghahari, S (2021) Detecting and measuring corruption and inefficiency in infrastructure projects using machine learning and data analytics, Unpublished PhD Thesis, , Purdue University.

Gkritza, K (2006) Economic development effects of highway investment, Unpublished PhD Thesis, , Purdue University.

Gonzalez-Quevedo, A A (1991) Sensitivity analysis of construction simulation, Unpublished PhD Thesis, , Purdue University.

Han, S (2005) Application modeling of the conventional and the GPS-based earthmoving systems, Unpublished PhD Thesis, , Purdue University.

Hassan, M E M (2017) Modeling the macroeconomic impact of construction spending as a public policy tool - the case of employment, Unpublished PhD Thesis, , Purdue University.

Hastak, M (1994) Decision support system for project cost control strategy and planning, Unpublished PhD Thesis, , Purdue University.

Hijazi, A M (1989) Simulation analysis of linear construction processes, Unpublished PhD Thesis, , Purdue University.

Holt, E A (2015) Analysis of the learning styles of undergraduate students in construction management bachelor degree programs in the US, Unpublished PhD Thesis, , Purdue University.

Hong, T (2005) Life-cycle cost assessment model of composite materials in construction, Unpublished PhD Thesis, , Purdue University.

Hsie, M (1994) Computer-aided acceptance planning: Generating quality acceptance parameters and stratified sampling plans through neural network learning ability and CAD modeling, Unpublished PhD Thesis, , Purdue University.

Huang, R-Y (1994) A graphical-based method for transient evaluation of construction operations, Unpublished PhD Thesis, , Purdue University.

Irizarry, J (2005) Safety issues in steel erection: Impact on task durations and risk perception of ironworkers, Unpublished PhD Thesis, , Purdue University.

Issariyanukula, A (2011) A probabilistic methodology for estimating transportation project costs using Bayesian models, Unpublished PhD Thesis, , Purdue University.

Jen, H (2005) Web-based construction process simulation framework, Unpublished PhD Thesis, , Purdue University.

Jeong, J G (2006) A framework for supply chain modeling and optimization for the manufactured housing industry, Unpublished PhD Thesis, , Purdue University.

Jiang, Y (1990) The development of performance prediction and optimization models for bridge management systems, Unpublished PhD Thesis, , Purdue University.

Johnson, P (2002) A quantitative assessment of knowledge and perceptions of civil engineering, Unpublished PhD Thesis, , Purdue University.

Kang, K (2018) Enhancing critical capacity of infrastructure supply chain to improve resilience of associated communities and infrastructure to disaster, Unpublished PhD Thesis, , Purdue University.

Khallaf, R (2016) Interactional risks associated with parties to a PPP project, Unpublished PhD Thesis, , Purdue University.

  • Type: Thesis
  • Keywords: duration; market; uncertainty; concession; governance; government; negotiation; partnership; project delivery; case studies; Delphi technique; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/1875930586
  • Abstract:
    Public private partnership (PPP) projects involve a variety of project governance structures. Common among all these varied structures is the long-term contractual period between multiple public and private entities. These entities include government, concessionaire and financier. The increased uncertainty of a long-term contract duration coupled with the involvement of multiple actors proves to be a challenge to developing risk mitigation strategies in PPP. Therefore, it is necessary to systematically collect, assess and frame the risks associated with these projects and explore associated dynamics. There has been a recent shift towards focusing on interactions of parties due to shared risks. Exploring the interactions among the parties in risk and renegotiation scenarios can help in understanding and mapping out the potential outcomes and multiple strategies for each party. The main objectives of this dissertation are: 1) Establish risks affecting PPPs: Macro, Market and Project level; 2) Identify timeline for the identified risks where they occur in or affect a project phase; 3) Analyze three-party interactions in the context of identified risks as well as renegotiation scenarios; and 4) Develop a model to quantify the actions/interactions between parties and the resulting outcome. This is tackled through the use of techniques such as Systematic Literature Review (SLR) and Delphi Technique to create a framework/model to assess risks in PPP projects. Following that scenario analysis, three-party interactional analysis and simulation were conducted to model the risk and renegotiation scenarios and analyze the range of potential outcomes for parties to the risk. This combined approach can help planners to prepare for a range of complex and uncertain scenarios. This dissertation extends the current literature by (i) integrating the framing of the risks with their modeling and simulation, and (ii) expanding the analysis of interactions to three parties in risk and renegotiation scenarios. Two case studies are conducted to showcase the proposed framework. This framework can be used by any party to a PPP project to assess risks and simulate risk scenarios to understand the outcome of the different strategies available. This can be used to propose mitigation strategies for each party. Interactional analysis, as proposed in this dissertation, has been introduced to simulate three-party interactions specifically in PPP risk scenarios. However, it can be further applied to other three-party situations in different project delivery methods such as for Integrated Project Deliver (IPD).

Khurshid, M B (2010) A framework for establishing optimal performance thresholds for highway asset interventions, Unpublished PhD Thesis, , Purdue University.

Kim, J (2004) Delay forecasting using a vulnerability index, Unpublished PhD Thesis, , Purdue University.

Lee, J H (2004) Object-based learning method in civil engineering, Unpublished PhD Thesis, , Purdue University.

Lee, S (2001) Simulation analysis of productivity variation affected by accident risk in underground construction operations, Unpublished PhD Thesis, , Purdue University.

Li, S (2017) Modeling, optimizing, and impact analysis of incentive and regulation mechanisms in infrastructure privatization, Unpublished PhD Thesis, , Purdue University.

Lombard, P C (1991) The relationship between highway infrastructure and regional economic development, Unpublished PhD Thesis, , Purdue University.

Louis, J (2016) Simulation analysis, monitoring, and control of operations, Unpublished PhD Thesis, , Purdue University.

Lueprasert, K (1996) Constructability knowledge acquisition: A machine learning approach, Unpublished PhD Thesis, , Purdue University.

Mahdavi, A (2016) A system-of-systems approach to ex-ante analysis of profit potential of a project portfolio, Unpublished PhD Thesis, , Purdue University.

Martinez, L H (2001) A neuro-fuzzy decision support system for risk analysis of revenue-dependent infrastructure projects, Unpublished PhD Thesis, , Purdue University.

Mohamed, S Y (2020) Stochastic performance and maintenance optimization models for pavement infrastructure management, Unpublished PhD Thesis, , Purdue University.

Mostafavi, A (2013) Ex-ante assessment of financial innovation policies in infrastructure system-of-systems, Unpublished PhD Thesis, , Purdue University.

Naderpajouh, N (2013) Interactional analysis of emergent risks in institutionally diverse construction projects, Unpublished PhD Thesis, , Purdue University.

Nakano, V M (2008) A design assessment system to protect buildings from internal chemical and biological threats, Unpublished PhD Thesis, , Purdue University.

Nitithamyong, P (2003) Analysis of success and failure factors in application of web-based project management systems in construction, Unpublished PhD Thesis, , Purdue University.

Orczyk, J J (1989) Parametric construction scheduling, Unpublished PhD Thesis, , Purdue University.

Panzeter, A A (1993) A methodology for modeling the cost and duration of concrete highway bridges, Unpublished PhD Thesis, , Purdue University.

Park, J (2017) Dynamic multi-dimensional BIM for total construction as-built documentation, Unpublished PhD Thesis, , Purdue University.

Park, S (2003) An analysis of the impact of information technology on the performance of construction contracting firms, Unpublished PhD Thesis, , Purdue University.

Patty, R M (1993) A construction engineering platform for the integration of constructability concepts and lessons learned at the point of design, Unpublished PhD Thesis, , Purdue University.

Puri, V (2012) Incorporation of continuous activities into activity cycle diagram based discrete event simulation for construction operations, Unpublished PhD Thesis, , Purdue University.

Riverso, M E (1984) A life cycle cost system for value engineering in building design and construction (economic, cost-codes, database), Unpublished PhD Thesis, , Purdue University.

Robert Thomas, R (2020) Examining the relationship of bid difference and disadvantaged business enterprise participation goals in highway construction projects, Unpublished PhD Thesis, , Purdue University.

Russell, J S (1988) A knowledge-based system approach to the contractor prequalification process, Unpublished PhD Thesis, , Purdue University.

Schexnayder, C J J (1980) Heavy construction equipment replacement economics, Unpublished PhD Thesis, , Purdue University.

Senior-Brown, B A (1993) A study of the planning and integrated cyclic analysis of serial system operations, Unpublished PhD Thesis, , Purdue University.

Shafaat, A (2016) Designing project systems in presence of variations, Unpublished PhD Thesis, , Purdue University.

Shahbodaghlou, F (1987) A feasibility model for use of weather protection in cold region construction, Unpublished PhD Thesis, , Purdue University.

Shaurette, M (2007) Assessment of webcam technology on teaching and learning in construction management education, Unpublished PhD Thesis, , Purdue University.

Shin, D H (2007) Strategic development of AR systems for industrial construction, Unpublished PhD Thesis, , Purdue University.

Shuck, D W (1983) Design phase cost estimating, Unpublished PhD Thesis, , Purdue University.

Sims, B L (1999) Program assessment of the Mechanical Contractors Association of America's construction continuing education project management course, Unpublished PhD Thesis, , Purdue University.

Singh, A (1990) Development of process and mix flexibility in construction, Unpublished PhD Thesis, , Purdue University.

Smith, G R (1986) A conceptual construction project planning model (fuzzy sets, networks), Unpublished PhD Thesis, , Purdue University.

Son, J (1997) Multi-heuristic approach to resource leveling in construction: A hybrid model, Unpublished PhD Thesis, , Purdue University.

Su, X (2013) A spatial temporal information model for construction planning, Unpublished PhD Thesis, , Purdue University.

Valentin, V (2011) Impact assessment of inter-organizational dynamics on the performance metrics of capital-intensive projects, Unpublished PhD Thesis, , Purdue University.

Vander Schaaf, R E (2008) A system-of-system (sos) approach for improved decision-making in infrastructure project selection problems, Unpublished PhD Thesis, , Purdue University.

Wang, H (2017) Construction project performance improvement through radio frequency identification technology application on a project supply chain, Unpublished PhD Thesis, , Purdue University.

Wang, J (2023) Direct policy search for adaptive management of flood risk, Unpublished PhD Thesis, , Purdue University.

Xin, X (2020) Semantic intelligence for knowledge-based compliance checking of underground utilities, Unpublished PhD Thesis, , Purdue University.

Yamin, R A (2001) Cumulative effect of productivity rates in linear schedules, Unpublished PhD Thesis, , Purdue University.

Yang, Z (2004) Assessing cumulative damage in concrete and quantifying its influence on life cycle performance modeling, Unpublished PhD Thesis, , Purdue University.

Yoon, Y J (2012) Planning of optimal rehabilitation strategies for infrastructure using time float and multiyear prioritization approach, Unpublished PhD Thesis, , Purdue University.

Zayed, T M (2001) Assessment of productivity for concrete bored pile construction, Unpublished PhD Thesis, , Purdue University.

Zhang, L (2002) Engineering performance improvement based on the integration of genetic algorithms and artificial neural networks, Unpublished PhD Thesis, , Purdue University.